TRI

WaveDrive

Programme

Power Take Off

Status

Completed

Stage

2

Lead contractor

Trident Energy Ltd

Sub-contractor(s)

SgurrEnergy Ltd
University of Warwick
42 Technology Ltd
Enercro Ltd

Overview

The WaveDrive project progressed the design and development of a low cost, highly reliable and highly controllable linear generator (LG) power take off (PTO) technology for wave energy converters (WECs). It combined detailed engineering design work with an advanced “wave to wire” model which allowed simulation of PTO performance across the full range of wave conditions and for a wide range of WEC devices.

The development of the direct drive linear generator as a power take off (PTO) system for wave energy converters directly addresses the cost, reliability and maintainability issues associated with current PTO solutions. In addition the development of an associated real-time control system based on solid state power electronics will lead to significantly increased technology performance for wave energy converters.

Stage 2

June 2017

This PTO stage 2 project summary report includes a description of the technology, scope of work, achievements and recommendations for further work.

Where to next?

Explore our other programmes, or find out more about how we operate.

Power Take Off

This programme supported a wide range of Power-Take Off systems that each proposed a step change in the capital cost and/or efficiency/performance over current technology.

Wave Technology

Explore the technology development programmes we have run at Wave Energy Scotland.

About Wave Energy Scotland

Wave Energy Scotland was created by request of the Scottish Government. Discover our purpose, our procurement model and more about our team.

Contact

Please get in touch if you need our help or would like to discuss working with us.